Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636537

- Product Categories
- Friendly Links
Information Name: | Dazu cheap floor paint |
Published: | 2015-01-24 |
Validity: | 30 |
Specifications: | 150 |
Quantity: | 1000000.00 |
Price Description: | |
Detailed Product Description: | Epoxy paint has a strong resistance to acids, alkalis, abrasion, pressure, impact resistance, mildew, waterproof, dustproof, anti-slip and anti-static, electromagnetic waves and other features, bright colors and diverse, easy to clean. It uses disposable coating process, no matter how much of the area does not exist in connection joints, but also a dust-free material, with strong adhesion, abrasion resistance, hardness and other characteristics. Epoxy floor paint is widely used in electronics factory, machinery factories, metal works, pharmaceutical, automobile factories, hospitals, aviation, aerospace bases, laboratories, offices, supermarkets, paper mills, chemical plants, plastic processing plants, textile mills, tobacco factory, candy factory, brewery, beverage plants, Roulian plants, parking lots and other surface coating. After painting is complete, should be fully spent the maintenance period; avoid construction at low temperature and high humidity conditions; two-component materials are mixed, it should be in a short construction: There have been many domestic manufacturers to accept and use precautions. can be put into use; according to the substrate flatness conditions and requirements, determine coating thickness. Surface flatness worse, on the use of thicker coating system, the greater the load coating, the coating should be thicker, as the coating is too thin, easily damaged during use, such as the need to do a good job on the first floor ground water treatment. Construction Technology 1, Su Su handle ① basis to cement powder glossy or Moshi prevail; ② hormone regimen to need more than 28 days, the water required to 8% below prime land before construction if uneven or need to be removed by hollowing; ③ fill with epoxy mortar flat ground; ④ prime land of oil demand fully implements clean; ⑤ construction before construction elements to the need to keep dry and clean; 2, before the construction of the undercoat ① need to keep clean if you need to clear the debris in accordance with proper adhesion the proportion of the primary agent hardener mix, stir; ② subject to ground conditions appropriate to adjust the viscosity of the mixed materials needed to complete the construction within four hours to complete; ③ above undercoat health hardening time of about 8 hours. 3, before the construction of the coating ① need to keep clean if you need to clear the debris adhered to in accordance with the correct proportion of the main agents and hardener mix, stir; ② resin finished adding the right amount of quartz sand mixed; ③ Use a trowel to material uniform coating; ④ mixing materials to be completed within 30 minutes of completion of construction; ⑤ construction junction proper interface processing; ⑥ above the coating health hardening time of about 8 hours. 4, granted in accordance with the correct proportion of coating ① main agent hardener mix, stir; ② use batch cutter material coating uniformity; ③ mixed construction materials to be completed within 30 minutes to complete; ④ batch of soil health hardening time of about 8 hours above; ⑤ depending on the actual needs of the number of road construction required to achieve smooth and no holes, no batch of knives and sanding India prevail. 5, the top coat before construction ① need to keep clean if you need to clear the debris adhered to; ② first before using the main agent stir; ③ in accordance with the correct proportion of the primary agent hardener mix, stir; ④ with a roller or trowel The material is applied uniformly mixed materials to be completed within 30 minutes of completion of construction; ⑤ transfer should be done to deal with the construction junction; ⑥ After construction is completed, 24 hours before the Master, 72 hours before stress (subject to 250C, cryogenic When appropriately extended opening hours required) Hotline: 023-8619-2916 Floor Paint Engineering: 18580203619 Mr. Chen Wei Online QQ: 24301392 Product Sales: 15736203694 Mr. Zhang online QQ: 1433879379 Company: Chongqing Seoul Plaza Building Decoration Engineering Co., Ltd. Address: Chongqing Dadukou Jinxia TIANCHEN Washington Street |
Admin>>>
You are the 23425 visitor
Copyright © GuangDong ICP No. 10089450, Seoul Plaza Chongqing Building Decoration Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 23425 visitor
Copyright © GuangDong ICP No. 10089450, Seoul Plaza Chongqing Building Decoration Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility