Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636537

- Product Categories
- Friendly Links
Information Name: | Chongqing Splendid Floor Coating System |
Published: | 2015-01-17 |
Validity: | 30 |
Specifications: | 150 |
Quantity: | 1000000000.00 |
Price Description: | |
Detailed Product Description: | Floor design based on: 1. Production and management needs of enterprises: epoxy floor suitable for electronics plants, chemical plants, food plants, electroplating plants, precision instrument components factory, textile, pharmaceutical, oil warehouses, walkways, shopping centers, hospitals, etc. to dust corrosion, electrostatic demanding production enterprises, according to different needs, choose a different focus of resin floor. 2. Use performance requirements: wear: When using the floor, what the vehicle traveling? Pressure: When using ground floor, will bear much load? Impact resistance: the floor when using an external impact force suffered much? Dust: The floor used for dust, clean the requirements of rank? Corrosion: The floor use, the type and concentration of corrosive chemicals size? Anti-static: The floor used for static electricity generated surface and volume electrical Yin Yin required range? 3. Elements to the base case: Floor circumstances: ① ground floor should be located waterproof layer, moisture treatment or choose to do a special floor. ② ground floor should be based on the needs of selecting the appropriate floor. ③ base layer floor: General requirements for compressive strength ≥20Mpa flatness within 3mm / 3m, uneven floors should use epoxy mortar floor. Floor preparation and post-production of conservation: 1. New Floor: ① cement mortar cement screed (pink light layer) shall be: sand: water = 1: 3: 0.5 ratio of construction, its thickness more than 50mm. ② floor by more than 28 days require maintenance, fully dry, fully cured concrete, to achieve the desired strength of the base layer. ③ plain ground surface moisture content of 8% or less, or not non-aqueous epoxy floor construction. ④ air temperature should be 75% or less, or should stop construction; when the temperature is below 5 ℃ use of special formula. ⑤ must ensure that no pre-construction floor surface stains, grease, dirt and dust and other substances. 2. Note conservation: ① construction is completed within 24-48 hours of staff shall enter, after seven days the weight. ② During the maintenance, not all types of water or solution infiltration. ③ a heavy impact or sharp objects scratching the area that needs to be placed rubber panels protection. ④ truck to use rubber tires. ⑤ daily with a soft broom to clean the floor or wipe clean with a rag. ⑥ floor when spilled acid, alkali, salt and oil, should be immediately washed with water, and wipe clean. ⑦ floor should be done by the local repair damage. Hotline: 023-8619-2916 Floor Paint Engineering: 18580203619 Mr. Chen Wei Online QQ: 24301392 Product Sales: 15736203694 Mr. Zhang online QQ: 1433879379 Company: Chongqing Seoul Plaza Building Decoration Engineering Co., Ltd. Address: Dadukou District, Chongqing Jinxia TIANCHEN Washington Street |
Admin>>>
You are the 23425 visitor
Copyright © GuangDong ICP No. 10089450, Seoul Plaza Chongqing Building Decoration Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 23425 visitor
Copyright © GuangDong ICP No. 10089450, Seoul Plaza Chongqing Building Decoration Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility